AZZA Fusion 3000 Full Tower Case
Feb 22nd, 2012 | By JaredA little different than most cases, the first step for the Fusion 3000 is installing the large case feet. Large rubber feet will help keep the case steady and help dampen any vibrations.
Installation of the optical drives is incredibly easy and since each screw can be slid back and forth getting the proper alignment is easy.
SSD installation is literally a snap, just a matter of setting the drive in the plastic clamshell and snapping it shut. 3.5″ hard drives still require four screws to secure the drive. Since the connectors in the back are not labeled for the SSD trays, figuring out which tray might require some trial and error.

Motherboard installation is a breeze with all of the room inside the Fusion 3000. With room for up to an XL-ATX leaves plenty of room for a ‘normal’ ATX board.
Even with minimal work put in, cable management is really quite easy and with a little more patience than I probably have, the Fusion 3000 can be a clean install.
With plenty of room on the right hand side of the case you can easily hide extra wires.
When you power up the Fusion the power and HD LEDs are blue and red. Now it is time to see just how well this behemoth performs.